Tommasin & C. S.r.l., an Italian company specialising in metal construction, particularly dished heads, took advantage of the Industry 4.0 incentives with the aim of optimising its production processes through software able to speed up many activities previously handled with tools that were not really digital. The company, which now aims for significant growth targets, can count on highly qualified staff and important certifications, including ASME Pressure Vessel Manufacturing.

Scheduling as the best support for the company's management strategy Building an efficient, feasible production plan to make the best use of available resources

Implementing the SCH module has brought numerous clear benefits. Accurate production management and a precise lead time have made it possible to avoid delivery delays and improve customer satisfaction. Organising the workloads of machines and workforce has optimised the use of available resources, reducing waste and increasing overall efficiency. In addition, thanks to the immediate planning offered by the SCH module, the company has been able to make informed, timely production decisions, reducing its reaction time to changes in demand and improving operational flexibility.

The project at a glance

01

Goals

For our customer Tommasin & C. S.r.l., a company specialising in the production of dished heads, we set ourselves the goal of optimising lead time and improving production planning. Accurate production management, organisation of the workloads of machines and workforce, and immediate planning are essential to improving the company's overall efficiency and productivity.

02

Solution

We developed and customised the SCH module as an integral part of the MOM (Manufacturing Operations Management) suite to meet the customer's specific needs. This module is linked synergistically to all materialSUITE® modules, allowing jobs to be scheduled both horizontally (from the delivery date back to the earliest possible start date) and vertically (all jobs from the resource's first available date onwards).

03

Benefits

The SCH module, synchronised with materialSUITE®, has provided a method for estimating job delivery times and has reduced the makespan of machine resources and manual work centres, enabling accurate and timely planning. Using advanced algorithms, such as backward scheduling and scheduling of outstanding work orders (BDL, Bolle di Lavoro), the system has automated the planning process, improving lead time and production times. The SCH module also offers intuitive drag & drop functions and lets operators lock certain phases of the production process and automatically recalculate the rest, ensuring planning that is flexible and responsive to the company's needs.

The solution behind this project

materialSUITE® SCH software · Production scheduling

Free demo + trial · with an expert consultant

Try the scheduler on your real orders

Digitise your production with a dedicated consultant.

Planning office with the materialSUITE® scheduler on screen
Denise Lipparini
Denise Lipparini
Operations and production planning expert, with you from the first call to the trial.

More case studies

All case studies

Want to know more?

Book a free meeting with our consultants: they'll answer every question.

Contact us
Request a demo